At kilometer 74.3 on the first level of return above Bergün is a small brick and Wegübergang Nachspannanlage for the overhead line. The 11 kV feeder line and the 66 kV transmission line will be here from the catenary masts gone out of the woods along with their poles on the upper valley.
This gives some interesting details for a replica that is rarely seen in model systems.













